What do you do on a garage floor when you have a control joint or an expansion joint in the concrete floor which you want to install the roll on rock system 4 over?

What do you do on a garage floor when you have a control joint or an expansion joint in the concrete floor which you want to install the roll on rock system 4 over?

PDF Print E-mail
Written by Jason Griffiths   
Friday, 04 September 2009 11:51

You always leave them.  Be careful not to let the epoxy puddle into the joint. When scraping the flake you will also trim the edges of saw cuts by slicing the scraper along the edge of joint.  This cuts the flake edges off to the edge of concrete leaving a clean line.  The reason you do not fill the joints is that whatever you fill it with will probably crack from the expansion and contraction of joint.

 

Cart

VirtueMart
Your Cart is currently empty.

Testimonials

Mike,

I just wanted to let you know that in dealing with the many suppliers we deal with and many very large manufacturers, nobody even comes close to your level of service and expertise. I have talked to Mark Glenridge many times about specific jobs and just different ideas I come up with and his input is invaluable. The people that take the orders are always extremely helpful, shipping is the fastest I've seen, products fantastic and your prices are great. Keep up the great work. You will always have us as loyal customers. Thanks again for the great service

Brian Comstock
C&S Flooring Systems

VBP Forum

Re:5400 v 5073
calconcrete 05.15.2012 17:57
5400 v 5073
GSNE 05.14.2012 21:59
Re: Thirsty stem walls
MNewman 05.14.2012 15:32
Thirsty stem walls
calconcrete 05.12.2012 17:21
Re:MVE ?
MNewman 05.07.2012 19:53